Home Up Feedback Contents Search

 

ERT Deployment SOP

S.O.P FOR HITCHING TRAILER (ERT)

OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        DATE . . . . . . . . . . . . . .

 

NAME . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .       CALLSIGN . . . . . . . . . .

PLEASE RETURN THIS FORM TO 02 AFTER OPERATION

 

HITCHING:

1 undo combination lock on back of trailer  
2 remove keys & unlock towhitch lock  
3 hitch trailer, make sure lock is pressed in  
4 lift jockey wheel (remove if required)  
5 connect power cable  
6 check electrics (left/right indicators etc)  
7 check tyres, including all nuts  
8 make sure all doors are locked  
9 make sure stabilising feet are up   
10 put safety chain on  towbar  

 

UNHITCHING:

1 make sure trailer  is on a level surface  
2 lower jockey wheel  
3 disconnect power  
4 put chocks in place behind wheels  
5 unhitch  
6 make sure stabilising feet are down  

 

COMMENTS:

 

 

 

Any questions? Please contact Trevor Wyborn, 083 978 4559

 

Home ] Up ] MICU Deployment SOP ] Comms Policy ] [ ERT Deployment SOP ] Trailer Wiring SOP ] Vehicle Signage ]
Send mail to d15@omnipage.co.za with questions or comments about this web site. 
Copyright © 1999 First Ready Development 259 (Association Incorporated under Section 21) 
t/a Delta Search & Rescue    Reg No. 2000 / 008763 / 08
Last modified: May 01, 2007
Web site design d15@omnipage.co.za